Value of starting up the power plant
Worldpower published an article by Cyriel de Jong, Hans van Dijken, Dirk van Abbema and Henk Sjoerd Los in 2010. In ‘The value of starting up the power plant’, the authors examine how the operational flexibility of gas-fired power plants, specifically their ability to start and stop production, affects their overall economic value.
Download directly this article
Valuing power plant flexibility
As power markets increasingly rely on flexible generation to balance renewable energy, understanding the costs and constraints associated with plant startups becomes essential. The study highlights that while flexibility allows operators to capture profitable market opportunities, it also introduces operational costs and limitations that must be carefully modeled.
Modeling plant value and operational constraints
Traditional valuation methods treat power plants as simple options on spark spreads, often ignoring operational constraints such as start costs, minimum run times, and limited start frequency. While this approach is straightforward, it can misrepresent the true value of a plant. More advanced modeling frameworks incorporate realistic price simulations, operational constraints, and optimization techniques to determine optimal production schedules. These models reveal that plant value depends not only on price levels but also on the flexibility to respond to market fluctuations.
Impact of start costs and constraints
The analysis shows that increasing start costs or introducing operational constraints significantly reduces the frequency of plant startups and lowers overall value. For example, higher startup costs discourage frequent cycling, while minimum run-time requirements limit operational flexibility. Similarly, imposing a cap on the number of annual starts, common in many contracts,forces operators to be more selective, reducing profitability. However, moderate limits have only a small impact, whereas strict limitations can reduce plant value substantially.
Perfect versus imperfect foresight
A key finding is that assuming perfect foresight about future prices leads to overestimating plant value. In reality, operators must make decisions under uncertainty, which limits their ability to choose optimal start times. By applying a Least-Squares Monte Carlo approach, the study incorporates realistic market uncertainty and shows that imperfect foresight reduces achievable value, especially when startup opportunities are limited.
Conclusion: importance of realistic modeling
The paper concludes that accurate valuation of power plants requires a combination of realistic price modeling, operational constraints, and optimization under uncertainty. While flexible plants derive significant value from their ability to respond to price volatility, this value is often overstated when ignoring real-world limitations. The results demonstrate that incorporating uncertainty can reduce plant value by around 5%, underscoring the importance of advanced modeling techniques for investment and operational decisions in modern energy markets.
This publication applies the methodologies as implemented in KyPlant software. Use KyPlant for pricing, risk managing and optimizing power plants. The real options-based model combines actual plant and contract characteristics with realistic price simulations. It is used for both physical and virtual power plants.

Download Value of starting up the power plant
"*" indicates required fields



