The future of gas CHP plants
In 2025, a gas plant operating at 52% efficiency (LHV) was ‘in-the-money’, meaning power prices exceeded fuel and carbon costs, in only 30% of hours on the German day-ahead market.
Historically, this figure was suppressed by overcapacity and competition from coal and nuclear. More recently, the growth of wind and solar has been pushing gas plants ‘out-of-the-money’ with increasing frequency, a trend that is set to continue.

But the number of ‘in-the-money’ hours alone does not tell the full story. What matters more is profitability and here the picture is more nuanced.
For plants with a must-run obligation, for example CHP assets supplying local heat, baseload operation increasingly results in loss making electricity generation. At the same time, the revenue potential for flexible plants is growing: a plant that can reduce output or switch off during out-of-the-money hours can largely avoid those losses.

KYOS Takeway
The implication is clear: operational flexibility is now the primary lever for maintaining the financial attractiveness of gas CHP assets.
The right flexibility strategy depends on asset-specific characteristics and locational constraints, but options worth modelling include:
- Electric boiler (e-boiler): substitutes gas-fired heat production during out-of-the-money or low-price hours, decoupling heat delivery from power generation.
- Fast start/stop capability: reduces the cost and time penalty of cycling, making short dispatch windows commercially viable.
- Minimum load reduction: lowers the loss of the plant while staying online, in between periods of profitable operating hours.
- On-site BESS: integrating a battery energy storage system (BESS) which takes the electricity during low-price hours, while heat demand continues to be met. The BESS then discharges to the grid during high‑price periods.
KYOS and its analytics toolkit draws on over two decades of experience in energy market modelling and asset optimisation. Need help analysing the business case for gas (CHP) power plant optimisation investments?